Operational characteristics of aluminum construction template (1):


建筑铝模板


1. Plan design


Before the construction, do a detailed and accurate analysis of the project and the design of the construction program, and cooperate with the modular, systematic, and standardized product series of the aluminum formwork system so that the problems that may be encountered in the construction can be solved to the maximum in the solution design stage. .


2. Quality accuracy


Aluminium formwork system uses high-strength aluminum alloy profiles welded to various standardized components according to different modules. Product manufacturing process, according to the United States related product quality control standards. The patchwork and overall accuracy of the template are much higher than the traditional template.


3 overall test equipment


In the traditional formwork and its construction methods, many installation problems are randomly handled by the construction site personnel, and construction efficiency and project quality are difficult to guarantee effectively. Before the aluminum mold system was shipped to the construction site, 100% of the entire test equipment was installed for the project. All possible problems were solved in the factory, which greatly improved the construction speed and accuracy.


4. Construction efficiency


The aluminum formwork system is mainly connected by pins and wedges, making the installation process extremely simple. Ordinary manual workers need only a simple training to perform the job. The only tool used is a carpentry hammer. Especially in the construction site where there are no tower cranes or tower cranes, due to the light weight of the aluminum formwork, it can be hand-carried, greatly accelerating the construction schedule and improving the construction efficiency. The construction period for assembling and pouring can easily reach 4 floors per floor.