中文 | RSS | XML

Business Consulting Phone:13081647847

产品中心

Product Categoriesproduct

Construction aluminum alloy formwork

  • category:Aluminum construction template

  • The number of clicks:
  • Release date:2018/05/23
  • Online Inquiry
Detailed introduction

Aluminium formwork manufacturers in the building organize the production according to the template production schedule. In the production process of aluminum alloy formwork, the total package needs to send professional management personnel to supervise the factory, and timely feedback its production quality, progress and test assembly results to the project department.


建筑铝合金模板


After the template production is completed, the organization technicians will try to assemble and code each template assembled. At the same time, the technical personnel of the aluminum alloy formworks will train and deliver the technical workers.


The site should prepare adequate temporary storage yards and vertical transport equipment in advance according to actual conditions. After the aluminum formwork and fittings enter the market, they shall be checked and accepted according to the acceptance criteria of their product quality, including single-piece inspections and assembly inspections. They can be used in the project only after acceptance.


The implementation of the application and construction phase of the project requires a good division of project management tasks, defining the scope of duties and tasks of each unit or individual in the organization structure, and paying attention to communication and collaboration to ensure the construction safety, quality, and schedule requirements.


URL of this article:http://en.xinhuoxin.com/product/565.html

Key words:建筑铝合金模板,建筑铝模板,建筑铝模板厂家

Previous:None
Next:Aluminum template factory

Recently Viewed: