High-rise building aluminum formwork construction quality control:


建筑铝模板


1. Because the engineering standard floor height is 3.0m, the tool steel pillar is selected as the formwork support, and the erection should be consistent with the construction specification. According to the plan, the line-up work should be done before the template support system is erected, and the sample unit should be completed. After the sub-module segmentation or overall support operation is completed, the relevant person in charge must perform the inspection and acceptance, and the acceptance quality of the sample can be met. Install rebar and cast concrete.


2. After the construction of the work ladder is completed, the formwork construction can be performed. The construction personnel cannot work up and down from the support system. During erection, demoulding or pouring of concrete, it is forbidden to pass unrelated persons under the mold. When the concrete strength of the lower floor slab structure conforms to the upper slab formwork and support system, the upper concrete construction can be carried out. If the construction design requirements do not match, the lower floor slab structural support system cannot be dismantled, and the upper and lower struts are required to be on the same vertical line. When installing the formwork or support system, reasonable settings should be made for I temporary fixtures to avoid dumping. When the pull screw is not set to the wall form, the plate surface can be tilted inward at a corresponding angle and the support work can be done well.


URL of this article:http://en.xinhuoxin.com/product/562.html

Key words:建筑铝模板施工,建筑铝模板,建筑铝模板厂家

Recently Viewed: