Aluminum alloy template process principle and process flow
Release date:2018-04-10 The author: Click on:
Aluminum alloy formwork, all known as the architectural aluminum alloy formwork system. It is a new generation of new formwork support system that follows the bamboo formwork and steel formwork. The application of aluminum formwork systems in the construction industry has increased the overall construction efficiency of the construction industry, including significant savings in construction materials and manual arrangements.
Aluminum alloy template process principle:
Aluminum alloy formwork system is based on the engineering construction and structural construction drawings, and the standard size formwork structural parts required by the finalized design and industrialized process customization and the non-standard parts used in the actual project are used. First, according to the design drawings completed in the factory pre-assembly, to meet the project requirements, all template components, sub-unit classification for the corresponding mark. The template materials are transported to the site and installed according to the template number "seat number". After the installation is in place, the verticality of the template is adjusted by the adjustable oblique support, and the horizontal elevation of the template is adjusted by the vertical adjustable support; the stiffness and overall stability of the formwork system are ensured by using the wall to pull the screw and the back rake. After the strength of the concrete reaches the strength of demoulding, the vertical support is retained, and the wall formwork, beam side formwork and floor form mould are removed in sequence, and the construction of the next layer is rapidly completed.
Aluminum alloy template process:
Surveying and Take-off Lines → Wall Column Rebar Bundle → Reserved for Buried → Receiving Works Acceptance → Wall Aluminum Alloy Formwork Installation → Beam Plate Aluminum Alloy Formwork Installation → Aluminum Alloy Formwork Correction and Reinforcement → Beam Plate Rebar Banding → Reserved for Pre-buried → Covert Project Acceptance →Concrete pouring and curing →Aluminum alloy formwork removal →Aluminum alloy template transportation
The above is the aluminum alloy template process principle and process flow. Did you understand? If you have any questions, please contact us.
This article URL:http://en.xinhuoxin.com/news/226.html
Key words:铝合金模板,铝合金模板工艺,新型铝合金模板
Recently Viewed:
Related Products:
Related news:
- Aluminum alloy formwork for winter construction concrete mixing
- What is the production process for building aluminum formwork?
- Aluminum alloy formwork construction process and technology introduction
- The value of architectural aluminum formwork
- The Development Prospect of Aluminum Alloy Formwork in Building Formwork
- Industrial aluminum profile manufacturers to discuss the processing method of industrial aluminum extrusion hardness is too low
- Aluminum alloy formwork technology economic advantages
- Aluminum alloy template has anti-rust properties
- Industrial aluminum profile manufacturers summarize the application of industrial aluminum profiles in various types of ships
- Integral Aluminum Alloy Formwork Process Overview